Updates From 5th & Cedar

It was a busy week at the 5th and Cedar site in Sandpoint, ID. This week, our crews stripped footing forms; formed, rebar installation, and poured stem walls; installed embeds and AB’s; and installed hydrophilic water-stop at elevator pit footing and wall.